Occupational Hearing Testing Resources
Occupational Hearing Testing FAQ
Authoritative answers to the real-world questions occupational health professionals face — from OSHA compliance edge cases and audiometer calibration to program design and SHOEBOX platform specifics.
1 question
Baseline Audiogram
Within 6 months of an employee's first exposure at or above the 85 dB action level, per 29 CFR 1910.95(g)(5)(i). The baseline must be preceded by at least 14 hours without workplace noise exposure, per (g)(5)(iii). Hearing protectors may substitute for the quiet period.
baseline audiogram deadlines and the 14-hour quiet period
Test baselines at the start of a shift, after a day off. That is how the 14-hour quiet period is met in practice, and it matters because the baseline is the reference every future test is measured against: a baseline recorded after a noisy shift can be temporarily depressed, and a depressed baseline makes later shifts look smaller than they are—or hides them entirely. The requirement reaches past the workplace as well. Under (g)(5)(iv), employers must notify employees to avoid high levels of non-occupational noise during those 14 hours, which makes a concert or a range session the night before a scheduling problem too.
The standard includes one exception. Under (g)(5)(ii), where mobile test vans are used, the baseline is due within one year rather than six months, and hearing protectors are required from month six until it is obtained. The exception exists because visit schedules and hire dates rarely line up. On-site testing capability makes the question moot: a baseline can run in a new hire’s first week, at the start of a shift, which is also when the 14-hour quiet period is easiest to satisfy.
